 2007 Construction of a Full Court Basketball Court at Post Park 

Post Park Basketball Court Excavation

2007 Construction of a Full Court Basketball Court at Post Park

The Town of Ulster Highway Department spent about a week in July at Post Park.  The crew expanded the basketball court from a half court to a full size court.  This job included excavating 12" of grass and clay and installation of the necessary stabilizing fabric, shale and stone dust.  After everything was compacted, a base coat of blacktop was applied to the new area, followed by a top coat of blacktop over both the old and new base.  Topsoil, seed and mulch was then applied on all areas affected by the project.

 

Frank C. Petramale

Road Maintenance Leader

Town of Ulster Highway 